Skip to content
Guide7 Oct 2026 · 7 min read

How much does a padel court cost in 2026: factory prices for all seven models and what is not included

Published prices of Orion XSport's seven padel courts, from USD 11,500 to 22,000 EXW; what that price covers, which costs are left out, and how to compare two quotes without fooling yourself.

See the court range
Gama — Orion XSport

A complete padel court bought factory-direct costs, in 2026, between USD 11,500 and 22,000 EXW depending on the model. That is the figure we publish on every spec sheet, and the one you can compare. What you cannot compare with a single number is what happens next: freight, customs, the concrete slab and assembly depend on your country and your site.

Here are the prices of the seven models, what the price includes, what it does not, and how to get from the factory price to the real cost on your plot without anyone surprising you halfway.

The seven models and their published prices

ModelWhat it isPrice per court, EXWStructure finish
Panoramic DebutEntry panoramicUSD 11,500Two-layer zinc primer and RAL 9017 powder; hot-dip galvanizing as an upgrade
Panoramic ArcMid-range panoramic, the same product indoors and outdoorsUSD 13,500Two-layer; hot-dip galvanizing as an upgrade
Classic CourtClassic, with meshUSD 14,300Two-layer; hot-dip galvanizing as an upgrade
Panoramic CrestHigh-end panoramicUSD 15,900Hot-dip galvanizing, standard
Superpanoramic ApexSuperpanoramic, no visible postsUSD 16,500Hot-dip galvanizing, standard
Anti HurricaneReinforced structure for wind zones, tested at 184 km/h (114 mph)USD 16,500Two-layer; hot-dip galvanizing as an upgrade
ShelterCourt with integrated PVC roofUSD 22,000Two-layer

Prices are per court, in US dollars. The price per court is the same for one court or ten: what changes with quantity is the shipping, not the court.

What the EXW price includes

EXW means the price of the court at our factory in Qingdao. Inside that figure is the complete court as described on each model's spec sheet:

The steel structure conforms to EN 1090-1 on every model. Hot-dip galvanizing, where standard or as an upgrade, follows EN ISO 1461.

What is not included, and must be budgeted

These items exist in every project. None of them carries a figure here, because any number would be wrong for half our readers: they are quoted in your country, in your currency, with your suppliers.

From factory price to cost on your site, in three steps

  1. Ask a freight forwarder for the sea freight with the data that matters: how many courts and to which port. Four courts fill a container and the freight per court drops; two courts fill half of one.
  2. Ask your customs broker for the tariff classification and import VAT in your country. It is the number that changes most from country to country, and nobody outside your country can state it.
  3. Get a slab and assembly quote from a local contractor using the external dimensions on the model's spec sheet.

Those three figures, added to the EXW price, give you the real cost. Without them, any comparison between manufacturers is a comparison between numbers that do not measure the same thing.

What makes the price go up or down

Lead time and payment

Padel courts are manufactured in 7 to 12 days from the confirmed deposit; the Shelter in 20 to 30, because it carries a roof. This is manufacturing time: shipping comes after and depends on the destination.

Payment is a 30 % deposit to enter production and 70 % before leaving the factory, by bank transfer. The factory price is not negotiated; what we do is tell you from the first message what is not included, so it does not appear later.

How to compare two quotes without fooling yourself

Before putting two figures side by side, check that they measure the same thing:

If a quote does not answer those six questions, it is not complete.

Frequently asked questions

How much does the cheapest padel court cost? The Panoramic Debut, USD 11,500 EXW per court, with 12 mm tempered glass and the same written warranty as the rest of the range.

Does the price include shipping to my country? No. The price is EXW, at the factory. Freight, insurance, duties and VAT are quoted separately, with your forwarder and your customs broker.

Does it include assembly? No. The client contracts assembly with a local installer. If you need one, we help you find one.

How long does manufacturing take? 7 to 12 days from the confirmed deposit. The Shelter, 20 to 30.

How many courts fit in a container? Four complete courts in a 40-ft open-top container.

All seven models, with their prices and standards side by side, are in the court comparison. And if you want the figure for your project, write to us on WhatsApp with how many courts and which city: with that we give you the factory price and request the freight.

Evaluating your next project?

Get a factory-direct EXW price: CE-marked glass and a written warranty.